Faxon Firearms Smith & Wesson M&P Patriot Slide w/RMR Cut 1
Currently Unavailable
View Product
Compare (0)
1 item has been added
Add at least two items to compare
Robert's Review of Faxon Firearms Smith & Wesson M&P Patriot Slide w/RMR Cut 1
Installation Instructions:
1. Remove any muzzle device and gas block from the barrel. Take the barrel nut and run it over the barrel, with the threaded end towards the breach and the end with the hex pattern towards the muzzle.
2. Install the barrel into the upper receiver and hand-tighten the barrel nut to the upper receiver.
3. Using the Crow's Foot Wrench, torque the barrel nut to 30-45 ft/lbs. Use the torque wrench/bar for detailed torque settings. 40 ft/lbs is recommended from the factory for best accuracy.
4. Install your gas block per the manufacturer recommendations. Make sure to align the gas tube correctly.
5. Slide the handguard over the barrel (it may take some small force to get the rail started over the barrel nut, that's okay). Seat fully against the upper receiver and align the rails at the top of the handguard and receiver.
6. Install the hex nuts in their receptacles on the bottom of the rail and tighten the cupped hex screws until reasonably tight. The factory recommends 30 in/lbs. Use non-permanent thread locker for long-term installations.
1. Remove any muzzle device and gas block from the barrel. Take the barrel nut and run it over the barrel, with the threaded end towards the breach and the end with the hex pattern towards the muzzle.
2. Install the barrel into the upper receiver and hand-tighten the barrel nut to the upper receiver.
3. Using the Crow's Foot Wrench, torque the barrel nut to 30-45 ft/lbs. Use the torque wrench/bar for detailed torque settings. 40 ft/lbs is recommended from the factory for best accuracy.
4. Install your gas block per the manufacturer recommendations. Make sure to align the gas tube correctly.
5. Slide the handguard over the barrel (it may take some small force to get the rail started over the barrel nut, that's okay). Seat fully against the upper receiver and align the rails at the top of the handguard and receiver.
6. Install the hex nuts in their receptacles on the bottom of the rail and tighten the cupped hex screws until reasonably tight. The factory recommends 30 in/lbs. Use non-permanent thread locker for long-term installations.
Would Recommend:
Yes